Engineering
We survey the site, model how much energy it will produce, and design the plant around that number.
- Topographic and soil survey
- PVsyst yield report
- Plant layout
- Single-line diagram
- Structure design for wind load
- Grid connectivity study
Design, equipment, construction and grid connection for megawatt-scale plants, under one contract with one team answerable for the result.
See what your plant needsEPC stands for engineering, procurement and construction. You sign with one company, and that company carries the design, the equipment and the schedule.
We survey the site, model how much energy it will produce, and design the plant around that number.
We buy and deliver every component, inspect it at the factory, and hand you the manufacturer warranties.
Our crews build the plant, connect it to the grid, and test it before handover.
The complete plant, from survey to synchronisation, at a fixed price. For owners who want one contract and one handover date.
You buy the modules, we supply and build everything else.
We run the plant after handover and report generation against the yield estimate every month.
Not ready to build yet? We assess the site, the grid connection and the returns so you can decide with real numbers.
Drag the slider for rough land, equipment and generation figures.
Rough figures, not a quotation. Assumes a DC to AC ratio of 1.3, 580 Wp modules, 3.5 acres per MWp on fixed structures, 0.5% yearly degradation and 0.7 t CO₂ per MWh of grid power.
Enquire for a 5 MW plantSunlight goes in at one end and metered units come out at the other. In between is a chain of equipment, each link sized so the plant earns the most over its life.
Stages overlap: equipment is ordered while approvals are in progress, so the site never waits.
We review your land, load and grid connection point, then visit the site.
Layout, yield report, bill of materials, price and schedule in one document.
Detailed design, grid connectivity application and statutory clearances.
Equipment arrives in sequence. Civil, mechanical and electrical works follow.
Testing, inspection, grid synchronisation and the performance ratio test.
The plant is tested against a performance ratio written into the contract. A shortfall is ours to fix.
A lump-sum price and a commissioning date, with liquidated damages if we run late.
Design, supply, construction and grid connection sit with one company.
Yield reports and drawings prepared to the standard banks and their technical advisors expect.
Makes and models are listed in the proposal, and the original warranties come to you.
Trained crews, inspections at each stage, and a punch list closed before you sign.
Plan for 4 to 5 acres per MW on fixed structures and 5 to 6 acres with trackers. The land should be fairly flat, free of shade and close to a substation.
A 1 to 5 MW plant usually takes 4 to 6 months from contract to commissioning. A 10 to 20 MW plant takes 6 to 8 months. Grid approvals and the evacuation line most often set the pace.
Cost depends on module prices at the time of order, distance to the substation, soil conditions and equipment choice. Send an enquiry and we will share a budgetary estimate, then a firm price after the site visit.
Within 5 km is comfortable for most projects of this size. Longer lines are workable and are priced into the proposal.
Often yes, through captive or open-access arrangements where the plant feeds the grid and your factory draws the equivalent energy. Rules and charges vary by state and utility, and we check them in the feasibility study.
We prepare the detailed project report and technical documents lenders ask for, and support you through their due diligence.
Send us the details and we will tell you what plant fits and what it takes to build it.